Don't Pay For Shipping! We ship your order of $100+ for FREE within the contiguous USA!
0 Cart
Added to Cart
    You have items in your cart
    You have 1 item in your cart
      Total

      Metal Building Insulation Calculator

      Built for existing metal building retrofit and cover-over installs. Enter your building dimensions, pick your product and framing spacing, add any doors, and get a complete material list - insulation rolls, seam tape, screws, and hardware - with live cart totals and one-click add to cart.

      Start My Estimate Prefer a Free Quote?

      Not sure which product to choose? Compare the 2mm Pro and 6mm Supreme before running the numbers. Questions about framing spacing? Call us at 800-595-8772 before ordering.

      What a Cover System Install Looks Like

      The BlueTex™ TermBar Cover System installs directly over existing failing insulation - no demo, no chemicals, no contractor license required. Drag the handles below to compare before and after on real installs.

      Metal building interior before BlueTex install Before
      Metal building interior after BlueTex install After

      Drag to compare

      Metal building roof before BlueTex install Before
      Metal building roof after BlueTex install After

      Drag to compare - Roof

      What This Calculator Covers

      This tool is designed for standard gable-roof metal buildings - agricultural shops, warehouses, barns, and commercial steel buildings with purlins at 48" on center. It handles both new installs on a bare steel frame and cover/retrofit installs using the BlueTex™ TermBar Cover System.

      Select the areas you want to insulate - roof only, walls only, or the full building - and the calculator will break out the material list by component. If you are doing a retrofit install over existing failing insulation, select the Cover System option and TermBar pack counts will be added to your list automatically.

      Material Calculator

      Existing Construction · Metal Building Retrofit

      1

      Building Dimensions

      : 12
      2

      Product Selection

      Framing Spacing

      CRITICAL To Get Correct!!

      Returning Product Is Prohibitively Expensive! If You Are Not Sure Don't Order.
      Call Us To Discuss 800-595-8772

      Product Type
      3

      Doors — Optional

      Door Type
      Doors: None  Is This Correct?
      4

      Overlap & Waste Allowance

      10% Recommended

      5%
      10%
      10%

      Why Framing Spacing Is the Most Important Input

      BlueTex rolls are sized to fit specific framing intervals - 50" wide for 48" on-center framing, 62" wide for 60" on-center framing. Ordering the wrong width means the material will not span your purlins correctly and cannot be returned without significant freight cost. If you are unsure of your framing spacing, measure the distance between purlin centerlines before ordering, or call us at 800-595-8772 before placing an order.

      How the Roll Yield Works

      Each roll is rated by total square footage, but the effective coverage per roll is lower because of the 2" overlap required at every seam. The calculator uses the actual effective yield - not the nominal roll size - so your roll count will not come up short on the job. The waste allowance (adjustable from 5% to 10%) is added on top of that to account for cuts around doors, windows, and corners.

      Roll-Up Doors vs. Insulated Panel Doors

      Roll-up doors get insulated with a cut piece of BlueTex laid over the door panel and held in place with double-sided tape - so the door area is included in your roll count and double-sided tape rolls are added to the list automatically. Insulated panel doors are deducted from the total wall area so you do not over-order material for openings that are already covered.

      Completed Installs

      Every one of these was done over existing insulation - no tearout, no demo.

      Red iron church building ceiling before BlueTex retrofit

      Red Iron Building Retrofit

      A red iron church covered its deteriorating ceiling insulation using BlueTex Supreme 6mm with the EasyClip system.

      Read the case study
      Warehouse before BlueTex Cover System install

      Damaged Warehouse Cover System

      A Tennessee fulfillment warehouse covered damaged insulation with BlueTex Pro - no removal required.

      Read the case study
      Oklahoma weld shop before and after BlueTex cover install

      Weld Shop - Before & After

      An Oklahoma weld shop covered aged wall insulation with BlueTex 2mm Pro - brighter interior, condensation controlled.

      Read the case study
      BlueTex EasyClip System and Roof Cover System guide

      EasyClip vs. Cover System

      Step-by-step comparison of the EasyClip System versus the Roof Cover System for retrofitting worn roofline insulation.

      Read the install guide
      New metal building North Texas BlueTex Supreme 6mm

      New Build - North Texas Shop

      A North Texas owner installed BlueTex Supreme 6mm in a new metal-framed shop - year-round comfort documented.

      Read the case study
      Installing BlueTex between old insulation and existing metal purlins

      Retrofit Behind Existing Purlins

      A technical guide for red iron and Z-purlin buildings - inserting BlueTex between existing insulation and the structural purlins.

      Read the install guide

      Related Products